Autoclave
| Service : | Open(Free) |
| How to use : | - |
| Storage location : | Autoclave Room |
| laboratory No. : | |
| Brand : | Zealway |
| Generation : | GR85SF |
| Code : | 69-1262-001/01 |
| Function : | - Automatic Water Feeding System: Provides convenient operation by automatically supplying water, eliminating the need for manual refilling before each sterilization cycle. - Rapid Cooling System: Equipped with a built-in cooling fan that significantly reduces the cooling time after the sterilization process is completed. - Multiple Program Modes: Offers a variety of preset programs tailored for laboratory applications, including medical waste sterilization and solution melting modes. - Temperature Range: Features precise microprocessor-controlled temperature regulation, adjustable from 105°C to 138°C. - Drying Function: Incorporates a standard-compliant drying system to ensure instruments and materials are thoroughly dried and ready for use. - Advanced Safety Features: Includes a water level sensor, over-temperature protection, safety valve, door interlock system to prevent opening while the chamber is pressurized or in operation, and an automatic power cut-off system to prevent overheating and equipment damage. - High-Quality Construction: The sterilization chamber is made of SUS304 stainless steel, providing excellent durability, corrosion resistance, and long service life. |
| Intendant : | Phanvasri Saengsuwan |
| Contact intendant : | 118295 |
| Price : | |
| Personnel/Internal department | - THB/Hours |
| Personnel/External department | - THB/Hours |
| Private department | - THB/Hours |
| Note : | - |
| Service charge file | - |
| Day off | Note |
|---|---|
| ไม่มีข้อมูล | |
| Name | Date start | Date end |
|---|---|---|
| Dailamee Wanso | 2026-05-27 09:00:00 | 2026-05-27 11:00:00 |
| Arrita Rueangrit | 2026-06-09 10:30:00 | 2026-06-09 13:30:00 |
| Arrita Rueangrit | 2026-06-11 10:26:00 | 2026-06-11 13:00:00 |
| Arrita Rueangrit | 2026-06-15 11:30:00 | 2026-06-15 14:00:00 |
| NATNAREE SATSUE | 2026-06-19 10:00:00 | 2026-06-19 12:00:00 |
| NATNAREE SATSUE | 2026-06-26 10:00:00 | 2026-06-26 12:00:00 |
| Dailamee Wanso | 2026-07-06 13:00:00 | 2026-07-06 15:00:00 |
| Dailamee Wanso | 2026-07-13 13:30:00 | 2026-07-13 15:30:00 |
| Dailamee Wanso | 2026-07-20 10:00:00 | 2026-07-20 12:00:00 |
| KURROTULAYUNEE KAREEYA | 2026-07-24 09:00:00 | 2026-07-24 11:00:00 |
| KITTIPAT CHAOLAN | 2026-08-25 13:00:00 | 2026-08-25 15:00:00 |
| JULAMAS PENGPRAPAI | 2026-08-31 15:00:00 | 2026-08-31 17:00:00 |
| Hmue Myat Nwe | 2026-09-11 12:30:00 | 2026-09-11 14:30:00 |
| KIARTTIPHONG MUADMUEANG | 2026-09-28 08:00:00 | 2026-09-28 10:00:00 |
| Name | Date start | Date end | Note |
|---|---|---|---|
| KANOKWAN KITIPANASIL | 2026-06-18 10:03:00 | 2026-06-18 12:00:00 | ไม่มีเหตุผล |
| Arrita Rueangrit | 2026-06-23 15:19:00 | 2026-06-23 05:00:00 | ไม่มีเหตุผล |
| KITTIPAT CHAOLAN | 2026-08-27 11:00:00 | 2026-08-27 13:00:00 | ไม่มีเหตุผล |
| JULAMAS PENGPRAPAI | 2026-08-27 13:00:00 | 2026-08-27 15:00:00 | ไม่มีเหตุผล |
| date | description | performed_by | next_maintenance | cost | remark | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ไม่มีข้อมูล | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

